
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1152		1		93
1151		2		103
1139		3		109
1132		4		116
1121		5		127
1107		7		136
1101		8		141
1092		9		146
1091		10		152
1077		11		155
1071		12		158
1062		13		161
1046		15		167
1044		18		27152
1042		17		32169
1040		19		49635

Optimization completed
----------------------
number of nodes     : 24
number of edges     : 52
number of demands   : 552
first solution time : 2
optimization time   : 180931
initial max maxLinkLoad    : 1161
final max maxLinkLoad      : 1040
number of tunnels   : 19
pre-optimization max link utilization 1.16223770842
post-optimization max link utilization 1.0406946048999999
1 demands over 552 (0.18115942028985507%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.952579152
