              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1153		1		126
1152		2		139
1151		3		147
1147		4		154
1123		5		167
1122		6		172
1120		7		183
1115		8		192
1094		9		201
1092		10		205
1091		11		209
1086		12		212
1066		13		216
1064		14		226
1063		15		299
1059		16		303
1056		16		49066
1050		17		49071
1046		18		61108
1044		20		100220
1043		20		102235

Optimization completed
----------------------
number of nodes     : 24
number of edges     : 52
number of demands   : 552
first solution time : 4
optimization time   : 180429
initial max maxLinkLoad    : 1180
final max maxLinkLoad      : 1043
number of tunnels   : 20
pre-optimization max link utilization 1.18115931278
post-optimization max link utilization 1.0441238224
2 demands over 552 (0.36231884057971014%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.450383972