
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1164		1		103
1161		2		119
1157		3		127
1134		4		133
1133		5		140
1130		6		145
1127		7		150
1103		8		161
1102		9		173
1099		10		193
1098		11		258
1097		12		260
1095		13		391
1093		14		7492
1091		16		47581
1089		16		52600
1088		16		64640
1087		16		78685
1084		16		86710

Optimization completed
----------------------
number of nodes     : 24
number of edges     : 52
number of demands   : 552
first solution time : 3
optimization time   : 180982
initial max maxLinkLoad    : 1189
final max maxLinkLoad      : 1084
number of tunnels   : 16
pre-optimization max link utilization 1.1896665022
post-optimization max link utilization 1.08486626212

Optimization time (in seconds): 180.999260802
