
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1157		1		119
1150		2		131
1148		3		137
1145		4		145
1128		5		151
1121		6		158
1120		7		163
1114		8		175
1096		9		180
1091		10		192
1085		12		202
1066		13		207
1062		14		211
1060		15		227
1056		16		230
1035		17		238

Optimization completed
----------------------
number of nodes     : 24
number of edges     : 52
number of demands   : 552
first solution time : 3
optimization time   : 180561
initial max maxLinkLoad    : 1188
final max maxLinkLoad      : 1035
number of tunnels   : 17
pre-optimization max link utilization 1.18927357502
post-optimization max link utilization 1.03589992858
1 demands over 552 (0.18115942028985507%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.580432387
