              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1154		1		84
1151		2		94
1148		3		101
1125		4		112
1123		5		119
1121		6		124
1119		7		128
1095		8		132
1093		9		137
1090		10		147
1088		11		151
1065		12		155
1064		13		163
1060		14		166
1058		15		173
1057		16		175
1056		17		5240
1055		18		6243
1052		19		52307
1047		20		59323
1041		21		64333

Optimization completed
----------------------
number of nodes     : 24
number of edges     : 52
number of demands   : 552
first solution time : 2
optimization time   : 180502
initial max maxLinkLoad    : 1174
final max maxLinkLoad      : 1041
number of tunnels   : 21
pre-optimization max link utilization 1.17477612436
post-optimization max link utilization 1.04215242962
1 demands over 552 (0.18115942028985507%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.514381591