              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1175		1		82
1165		2		89
1155		3		95
1144		4		101
1136		5		106
1126		6		110
1124		7		113
1112		8		118
1105		9		122
1098		10		125
1093		11		128
1081		12		131
1079		13		4397
1077		13		50457
1075		14		52462
1070		16		64488

Optimization completed
----------------------
number of nodes     : 24
number of edges     : 52
number of demands   : 552
first solution time : 7
optimization time   : 180635
initial max maxLinkLoad    : 1186
final max maxLinkLoad      : 1070
number of tunnels   : 16
pre-optimization max link utilization 1.18690193394
post-optimization max link utilization 1.0709044338399998
1 demands over 552 (0.18115942028985507%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.651807302