
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1110		1		125
1099		2		144
1079		3		152
1078		4		151769

Optimization completed
----------------------
number of nodes     : 22
number of edges     : 48
number of demands   : 462
first solution time : 8
optimization time   : 180826
initial max maxLinkLoad    : 1113
final max maxLinkLoad      : 1078
number of tunnels   : 4
pre-optimization max link utilization 1.1136005250749998
post-optimization max link utilization 1.079196283275
1 demands over 462 (0.21645021645021645%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.84984802
