
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1091		1		91
1087		2		103
1086		3		117
1084		4		844
1082		6		1269
1080		7		1290
1079		8		164571

Optimization completed
----------------------
number of nodes     : 22
number of edges     : 48
number of demands   : 462
first solution time : 3
optimization time   : 180728
initial max maxLinkLoad    : 1096
final max maxLinkLoad      : 1079
number of tunnels   : 13
pre-optimization max link utilization 1.096808252975
post-optimization max link utilization 1.080326390125
1 demands over 462 (0.21645021645021645%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.744366905
