
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1095		1		95
1090		2		102
1071		3		110
1069		8		5103

Optimization completed
----------------------
number of nodes     : 22
number of edges     : 48
number of demands   : 462
first solution time : 4
optimization time   : 180033
initial max maxLinkLoad    : 1104
final max maxLinkLoad      : 1069
number of tunnels   : 25
pre-optimization max link utilization 1.1047377343
post-optimization max link utilization 1.070404439125
1 demands over 462 (0.21645021645021645%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.04914272
