
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1158		2		81
1142		3		5388
1139		5		5390
1129		4		5643
1105		7		5745
1090		8		7365
1081		9		8368
1076		10		10998
1055		13		171238

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 30
number of demands   : 210
first solution time : 2
optimization time   : 180248
initial max maxLinkLoad    : 1180
final max maxLinkLoad      : 1055
number of tunnels   : 13
pre-optimization max link utilization 1.180676384457143
post-optimization max link utilization 1.0562092782285712
1 demands over 210 (0.47619047619047616%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.261909807
