
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1162		1		1583
1126		2		1586
1090		4		1591
1088		5		1601
1066		6		2465
1060		7		2468
1052		8		3298
1035		9		9969
1026		10		63024

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 30
number of demands   : 210
first solution time : 1
optimization time   : 180143
initial max maxLinkLoad    : 1163
final max maxLinkLoad      : 1026
number of tunnels   : 10
pre-optimization max link utilization 1.1644104387714285
post-optimization max link utilization 1.027131839057143
1 demands over 210 (0.47619047619047616%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.158517931
