
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1105		1		103
1104		2		150
1063		3		156
1062		4		213
1031		6		215
1026		7		49178
1024		8		97228
1001		8		97230

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 30
number of demands   : 210
first solution time : 2
optimization time   : 180319
initial max maxLinkLoad    : 1142
final max maxLinkLoad      : 1001
number of tunnels   : 9
pre-optimization max link utilization 1.1425689406857145
post-optimization max link utilization 1.0018658882857143
1 demands over 210 (0.47619047619047616%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.333511367
