
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1152		2		105
1148		2		9609
1129		3		9611
1121		4		9617
1098		6		9622
1090		7		9623
1074		8		9625
1071		11		9629

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 30
number of demands   : 210
first solution time : 2
optimization time   : 180804
initial max maxLinkLoad    : 1196
final max maxLinkLoad      : 1071
number of tunnels   : 11
pre-optimization max link utilization 1.1972776823999998
post-optimization max link utilization 1.0722195560285714
1 demands over 210 (0.47619047619047616%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.822303751
