
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1115		1		112
1096		2		136
1075		3		147
1063		4		150
1057		5		581
1050		6		639
1033		7		641
1018		8		1505
1000		10		8163

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 30
number of demands   : 210
first solution time : 2
optimization time   : 180887
initial max maxLinkLoad    : 1139
final max maxLinkLoad      : 1000
number of tunnels   : 10
pre-optimization max link utilization 1.1397438838000002
post-optimization max link utilization 1.001039718885714
1 demands over 210 (0.47619047619047616%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.901054075
