
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1156		1		100
1136		2		2355
1114		3		10365
1108		4		10367
1079		5		11352

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 30
number of demands   : 210
first solution time : 2
optimization time   : 180236
initial max maxLinkLoad    : 1159
final max maxLinkLoad      : 1079
number of tunnels   : 5
pre-optimization max link utilization 1.1597048150285714
post-optimization max link utilization 1.0798445001428572
1 demands over 210 (0.47619047619047616%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.259601777
