              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1157		1		71

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 30
number of demands   : 210
first solution time : 5
optimization time   : 180229
initial max maxLinkLoad    : 1192
final max maxLinkLoad      : 1157
number of tunnels   : 1
pre-optimization max link utilization 1.1930178312571431
post-optimization max link utilization 1.1579784558285713
1 demands over 210 (0.47619047619047616%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.242058301