
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1078		1		104
1031		2		117
1028		3		132
1022		4		139
1012		5		151
989		6		164
984		7		168
980		7		176
978		8		179
972		9		198
968		10		206
960		11		218
952		12		222

Optimization completed
----------------------
number of nodes     : 18
number of edges     : 48
number of demands   : 306
first solution time : 2
optimization time   : 180889
initial max maxLinkLoad    : 1127
final max maxLinkLoad      : 952
number of tunnels   : 12
pre-optimization max link utilization 1.1280064100666665
post-optimization max link utilization 0.9530061744666666
2 demands over 306 (0.6535947712418301%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.907816722
