
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1043		1		113
1020		2		126
1014		3		144
1000		4		151
992		5		158
980		7		166
975		9		176
966		10		179
964		10		189
962		11		192
951		12		208
943		13		215
940		15		220
937		15		223
933		16		225
925		17		266
922		18		398
918		18		400
917		19		406
916		20		416
913		23		449
912		27		3617
911		36		7906

Optimization completed
----------------------
number of nodes     : 18
number of edges     : 48
number of demands   : 306
first solution time : 2
optimization time   : 180334
initial max maxLinkLoad    : 1054
final max maxLinkLoad      : 911
number of tunnels   : 38
pre-optimization max link utilization 1.0551113397
post-optimization max link utilization 0.9121889350166666
10 demands over 306 (3.2679738562091503%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.353796047
