
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1071		1		93
1053		2		106
1018		3		114
1006		4		119
998		5		125
985		6		129
969		7		133
963		8		141
948		9		151
942		10		154
931		11		156
929		12		162
924		13		165
918		14		168
916		15		170
913		17		184
910		18		198

Optimization completed
----------------------
number of nodes     : 18
number of edges     : 48
number of demands   : 306
first solution time : 4
optimization time   : 180135
initial max maxLinkLoad    : 1121
final max maxLinkLoad      : 910
number of tunnels   : 20
pre-optimization max link utilization 1.1214896504666665
post-optimization max link utilization 0.9109702983166669
2 demands over 306 (0.6535947712418301%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.150171621
