
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1092		1		95
1053		2		109
1044		3		125
1007		4		131
999		5		136
994		6		139
988		7		143
972		8		153
966		9		158
962		10		160
954		11		162
952		12		165
941		12		167
938		13		181
928		14		183
926		13		213
925		14		232
924		15		254
923		16		259
918		16		262
915		16		307
914		18		354
913		21		373
906		23		376
905		25		549

Optimization completed
----------------------
number of nodes     : 18
number of edges     : 48
number of demands   : 306
first solution time : 3
optimization time   : 180399
initial max maxLinkLoad    : 1095
final max maxLinkLoad      : 905
number of tunnels   : 29
pre-optimization max link utilization 1.0961180173333334
post-optimization max link utilization 0.9061149617083334
5 demands over 306 (1.6339869281045751%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.419383483
