
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
514		1		215
513		3		338
510		4		688
507		7		712
506		10		736
505		11		754
504		14		787
503		17		835
501		17		866
498		25		5419
497		28		5454

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180324
initial max maxLinkLoad    : 515
final max maxLinkLoad      : 497
number of tunnels   : 30
pre-optimization max link utilization 0.5152523777833334
post-optimization max link utilization 0.49787835712916667
3 demands over 182 (1.6483516483516483%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.338953408
