
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
530		1		93
529		3		179
526		6		228
525		6		239
524		7		365
521		6		378
520		7		381
519		10		608
518		10		612
517		11		628
516		17		694
515		17		708
514		20		3378
513		23		15400
512		26		15408
511		32		15724
510		37		15890

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180766
initial max maxLinkLoad    : 542
final max maxLinkLoad      : 510
number of tunnels   : 40
pre-optimization max link utilization 0.5424160127541665
post-optimization max link utilization 0.5107137694083335
11 demands over 182 (6.043956043956044%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.78547345
