
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
532		1		77
529		2		91
528		5		132
527		6		136
526		13		564
519		14		570
518		18		795
517		18		865
516		21		901
515		27		1113
514		31		62591
513		33		80344

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180998
initial max maxLinkLoad    : 544
final max maxLinkLoad      : 513
number of tunnels   : 33
pre-optimization max link utilization 0.5448541647
post-optimization max link utilization 0.5140892364249999
9 demands over 182 (4.945054945054945%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 181.02171424
