
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
536		2		87
534		5		194
533		8		212
532		11		298
530		14		314
529		17		558
528		17		583
527		23		5889
526		26		5965
525		28		47218
524		29		52225
523		31		62184
522		31		73197
521		31		108235

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180301
initial max maxLinkLoad    : 539
final max maxLinkLoad      : 521
number of tunnels   : 31
pre-optimization max link utilization 0.539299771775
post-optimization max link utilization 0.522049105225
2 demands over 182 (1.098901098901099%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.31691375
