
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
528		3		125
527		6		180
524		9		235
523		12		307
522		12		317
521		16		6120
520		16		6122
519		19		6179
518		21		6283

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180310
initial max maxLinkLoad    : 530
final max maxLinkLoad      : 518
number of tunnels   : 21
pre-optimization max link utilization 0.5300375310541666
post-optimization max link utilization 0.5189185974916667
7 demands over 182 (3.8461538461538463%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.324745503
