
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
541		2		132
540		4		167
537		5		194
535		8		220
533		11		275
531		14		1572
530		16		1578
529		15		1581
527		17		1589
526		20		1607
525		20		2194
524		23		13822
521		26		16455
520		31		17064

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 3
optimization time   : 180238
initial max maxLinkLoad    : 548
final max maxLinkLoad      : 520
number of tunnels   : 31
pre-optimization max link utilization 0.5480560121166667
post-optimization max link utilization 0.5209577078333334
10 demands over 182 (5.4945054945054945%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.254922511
