
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
526		1		102
525		3		290
521		6		327
519		9		357
518		10		391
517		14		488
515		14		497
513		17		507
512		17		510
511		20		558
509		20		565
508		23		782
507		30		8557

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180737
initial max maxLinkLoad    : 538
final max maxLinkLoad      : 507
number of tunnels   : 30
pre-optimization max link utilization 0.5381976269083333
post-optimization max link utilization 0.508053010675
4 demands over 182 (2.197802197802198%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.761818501
