
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
518		1		91
517		4		158
515		7		353
514		10		379
510		15		2020
509		20		2028
508		22		2051
507		25		2054
506		24		2064
505		27		2419
504		32		7238

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 3
optimization time   : 180665
initial max maxLinkLoad    : 528
final max maxLinkLoad      : 504
number of tunnels   : 32
pre-optimization max link utilization 0.5280268465166665
post-optimization max link utilization 0.5051544877625
11 demands over 182 (6.043956043956044%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.705220941
