
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
538		2		121
537		6		210
531		7		253
530		7		259
527		7		264
526		9		358
525		12		620
524		21		667
523		26		6053
522		30		6147
521		30		6150
520		30		6723
519		31		70926

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 4
optimization time   : 180291
initial max maxLinkLoad    : 539
final max maxLinkLoad      : 519
number of tunnels   : 35
pre-optimization max link utilization 0.5394059874125
post-optimization max link utilization 0.5201400576791667
8 demands over 182 (4.395604395604396%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.310128639
