
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
513		6		207
512		8		214
511		11		225
509		11		231
508		14		264
507		17		347
506		20		416
505		24		4319
504		30		10273

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180471
initial max maxLinkLoad    : 514
final max maxLinkLoad      : 504
number of tunnels   : 32
pre-optimization max link utilization 0.5145469783791666
post-optimization max link utilization 0.505100828175
9 demands over 182 (4.945054945054945%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.48921876
