
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
514		1		90
513		3		119
511		4		127
506		7		148
504		8		152
500		9		155
499		12		225
498		16		316
497		16		319
496		19		329
495		19		333
494		25		382
493		31		15776
492		33		17879

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180042
initial max maxLinkLoad    : 525
final max maxLinkLoad      : 492
number of tunnels   : 33
pre-optimization max link utilization 0.5252580620375
post-optimization max link utilization 0.49291905792083335
6 demands over 182 (3.2967032967032965%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.054347624
