
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
522		2		95
518		4		188
516		7		204
514		9		230
513		12		360
511		15		400
509		17		421
508		20		473
507		26		501

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180615
initial max maxLinkLoad    : 524
final max maxLinkLoad      : 507
number of tunnels   : 30
pre-optimization max link utilization 0.5246938263208334
post-optimization max link utilization 0.5079875284583334
4 demands over 182 (2.197802197802198%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.630552092
