
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
533		1		115
531		2		120
530		3		129
527		5		291
523		8		296
522		8		304
520		11		311
519		14		351
517		20		397

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180439
initial max maxLinkLoad    : 535
final max maxLinkLoad      : 517
number of tunnels   : 23
pre-optimization max link utilization 0.5357074899666667
post-optimization max link utilization 0.5176011573833333
4 demands over 182 (2.197802197802198%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.455302255
