
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
524		2		134
521		4		146
517		6		188
516		8		226
515		11		233
511		14		263

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 3
optimization time   : 180526
initial max maxLinkLoad    : 527
final max maxLinkLoad      : 511
number of tunnels   : 18
pre-optimization max link utilization 0.5271449440625
post-optimization max link utilization 0.5120390031583334
4 demands over 182 (2.197802197802198%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.541877789
