
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
531		1		106
521		2		119
520		5		166
519		9		234
518		9		238
517		9		242
516		15		583
515		16		591
514		20		767
513		26		863
512		33		3337
511		37		156561
510		38		156709
509		40		157506
508		40		172535

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180808
initial max maxLinkLoad    : 534
final max maxLinkLoad      : 508
number of tunnels   : 41
pre-optimization max link utilization 0.5343875851416667
post-optimization max link utilization 0.5087839236125
11 demands over 182 (6.043956043956044%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.820981951
