
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
515		1		87
514		4		154
513		8		204
511		8		211
509		8		214
507		9		331
506		9		334
505		9		336
504		12		460
503		13		464
502		17		557
501		23		574
500		27		3546
499		27		3690

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 3
optimization time   : 180905
initial max maxLinkLoad    : 520
final max maxLinkLoad      : 499
number of tunnels   : 32
pre-optimization max link utilization 0.5203468004
post-optimization max link utilization 0.500002740375
4 demands over 182 (2.197802197802198%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.932618246
