
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
517		1		96
516		4		162
515		8		568
514		9		585
513		11		588
511		12		595
509		13		597
508		13		600
506		16		613
505		18		626
502		18		627
501		18		678

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180604
initial max maxLinkLoad    : 527
final max maxLinkLoad      : 501
number of tunnels   : 18
pre-optimization max link utilization 0.5274339064166668
post-optimization max link utilization 0.5019993050083333
1 demands over 182 (0.5494505494505495%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.618208613
