
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
526		1		91
515		2		128
514		9		1113
512		10		1115
510		13		1118
508		16		1142
506		19		1157
505		20		1160
504		20		1278
503		21		1471
501		23		1473
500		23		1474
499		23		1475
498		26		5499

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180185
initial max maxLinkLoad    : 537
final max maxLinkLoad      : 498
number of tunnels   : 27
pre-optimization max link utilization 0.5378198835
post-optimization max link utilization 0.49907236608333333
7 demands over 182 (3.8461538461538463%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.196047214
