
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
515		2		137
514		3		145
513		6		215
510		9		258
508		12		289
507		13		303
504		13		392
503		16		470
502		19		596
501		23		6141
498		25		7144
497		30		67451

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 3
optimization time   : 180644
initial max maxLinkLoad    : 518
final max maxLinkLoad      : 497
number of tunnels   : 31
pre-optimization max link utilization 0.5181854102541668
post-optimization max link utilization 0.4980469571958333
9 demands over 182 (4.945054945054945%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.656785483
