              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
540		3		115
538		4		151
536		7		166
534		7		175
532		10		192
531		10		226
530		13		229
529		16		1174
527		18		4757
526		23		4878
525		24		4879
523		27		4881
522		30		4885
520		31		5004
519		32		5035

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180344
initial max maxLinkLoad    : 542
final max maxLinkLoad      : 519
number of tunnels   : 32
pre-optimization max link utilization 0.5419691555874999
post-optimization max link utilization 0.5199329679625001
10 demands over 182 (5.4945054945054945%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.354690465