
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
535		1		85
523		2		97
519		5		133
518		5		142
517		8		164
516		11		242
512		15		772
511		17		3191
510		20		3237
508		21		3238
507		24		5276

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180772
initial max maxLinkLoad    : 544
final max maxLinkLoad      : 507
number of tunnels   : 27
pre-optimization max link utilization 0.5442770632
post-optimization max link utilization 0.5080422695625
8 demands over 182 (4.395604395604396%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.782160724
