
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
534		1		82
530		2		89
525		3		104
524		6		199
522		9		241
520		9		244
518		12		287
517		15		306
516		15		312
513		17		343
512		21		2697
511		22		3067

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 2
optimization time   : 180134
initial max maxLinkLoad    : 546
final max maxLinkLoad      : 511
number of tunnels   : 22
pre-optimization max link utilization 0.5460776501125
post-optimization max link utilization 0.5121344737916667
7 demands over 182 (3.8461538461538463%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.144801736
