
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
527		2		108
526		5		147
524		6		151
523		9		165
522		12		181
521		15		185
520		15		194
519		15		206
518		18		210
517		21		215
516		25		479
515		30		6336
514		35		12253
513		41		178595
512		40		178679

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 30
number of demands   : 182
first solution time : 3
optimization time   : 180682
initial max maxLinkLoad    : 528
final max maxLinkLoad      : 512
number of tunnels   : 40
pre-optimization max link utilization 0.5289871652458333
post-optimization max link utilization 0.5129868738041666
10 demands over 182 (5.4945054945054945%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.692673837
