
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1180		1		129
1169		2		182
1156		3		205
1150		4		231
1138		5		252
1132		6		259
1126		7		311
1120		8		349
1114		9		373
1113		10		382
1102		11		410
1101		12		416
1096		13		419
1090		14		423
1089		15		428
1077		16		431
1070		18		443

Optimization completed
----------------------
number of nodes     : 27
number of edges     : 58
number of demands   : 702
first solution time : 3
optimization time   : 180328
initial max maxLinkLoad    : 1193
final max maxLinkLoad      : 1070
number of tunnels   : 18
pre-optimization max link utilization 1.1934634847180001
post-optimization max link utilization 1.0704232878239999
1 demands over 702 (0.14245014245014245%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.350655413
