
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1139		1		111
1137		2		128
1131		3		135
1127		4		142
1125		5		147
1121		6		169
1119		7		182
1109		8		187
1107		9		212
1100		10		224
1097		11		227
1088		12		232
1085		13		235
1080		14		241

Optimization completed
----------------------
number of nodes     : 27
number of edges     : 58
number of demands   : 702
first solution time : 5
optimization time   : 180663
initial max maxLinkLoad    : 1149
final max maxLinkLoad      : 1080
number of tunnels   : 15
pre-optimization max link utilization 1.1498202167559999
post-optimization max link utilization 1.08082757476
1 demands over 702 (0.14245014245014245%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.701164387
