              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1135		1		110
1130		2		119
1123		3		130
1118		4		139
1111		5		144
1106		6		152
1101		7		165
1100		8		175
1096		9		190
1094		10		197
1089		11		200
1088		12		205
1083		13		210
1075		14		216
1071		15		230
1063		16		250
1058		17		262
1052		18		268

Optimization completed
----------------------
number of nodes     : 27
number of edges     : 58
number of demands   : 702
first solution time : 5
optimization time   : 180112
initial max maxLinkLoad    : 1143
final max maxLinkLoad      : 1052
number of tunnels   : 18
pre-optimization max link utilization 1.143507886398
post-optimization max link utilization 1.053034220504
1 demands over 702 (0.14245014245014245%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.136276702