
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1157		1		97
1144		2		115
1143		3		132
1138		4		139
1132		5		146
1131		6		161
1120		7		165
1118		8		170
1115		9		177
1105		10		185
1103		11		189
1093		12		204
1090		13		212
1080		14		223
1078		15		227
1069		16		241
1066		17		244
1061		18		247

Optimization completed
----------------------
number of nodes     : 27
number of edges     : 58
number of demands   : 702
first solution time : 3
optimization time   : 180830
initial max maxLinkLoad    : 1168
final max maxLinkLoad      : 1061
number of tunnels   : 18
pre-optimization max link utilization 1.169009011584
post-optimization max link utilization 1.062093832992

Optimization time (in seconds): 180.858283127
