              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1182		1		142
1178		2		160
1170		3		166
1166		4		178
1157		5		186
1154		6		203
1147		7		217
1145		8		235
1135		9		242
1133		10		247
1123		11		253
1120		12		256
1111		13		260
1109		14		263
1098		15		268
1096		16		272
1090		17		274
1085		18		278
1077		19		281
1073		20		285
1070		21		288

Optimization completed
----------------------
number of nodes     : 27
number of edges     : 58
number of demands   : 702
first solution time : 5
optimization time   : 180672
initial max maxLinkLoad    : 1195
final max maxLinkLoad      : 1070
number of tunnels   : 21
pre-optimization max link utilization 1.195547298564
post-optimization max link utilization 1.070950035496
3 demands over 702 (0.42735042735042733%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.697445279