
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1153		1		104
1150		2		118
1138		3		133
1126		4		144
1117		5		159
1113		6		166
1105		7		178
1101		8		182
1092		9		187
1089		10		191
1081		11		205
1077		12		208
1068		13		221
1065		14		227
1059		15		231
1056		16		241
1053		17		244
1052		18		247

Optimization completed
----------------------
number of nodes     : 27
number of edges     : 58
number of demands   : 702
first solution time : 5
optimization time   : 180409
initial max maxLinkLoad    : 1165
final max maxLinkLoad      : 1052
number of tunnels   : 18
pre-optimization max link utilization 1.1660140200079998
post-optimization max link utilization 1.0528416813359998
1 demands over 702 (0.14245014245014245%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.433686409
