
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1153		1		111
1140		2		126
1129		3		144
1116		5		170
1104		7		179
1098		9		196
1093		11		204
1092		12		210
1080		13		216
1079		14		220
1075		15		231
1072		16		236
1067		17		241
1066		18		245
1056		19		250
1055		20		252

Optimization completed
----------------------
number of nodes     : 27
number of edges     : 58
number of demands   : 702
first solution time : 4
optimization time   : 180396
initial max maxLinkLoad    : 1164
final max maxLinkLoad      : 1055
number of tunnels   : 20
pre-optimization max link utilization 1.1651892942039996
post-optimization max link utilization 1.0564260426399998
1 demands over 702 (0.14245014245014245%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.421015635
